122 Rate/Value Qualifier
Code qualifying how to extend charges or interpret value.
- Type
- Identifier (ID)
- Length
- Min 2 / Max 2
- Codes
| Code | Description |
|---|
| AV | Ad Valorum (Per Cent of Value) |
| BF | Per 1,000 Board Feet |
| CF | Per 40 Cubic Feet (Measurement Ton) |
| CM | Per Cubic Meter |
| CT | Charge or Credit Based on Percentage of Total |
| EI | Ex Parte Increase |
| FR | Flat Rate |
| FV | Loaded to Full Visible Capacity |
| GT | Per Gross Ton |
| KL | Per Kiloliter |
| LB | Per Pound |
| LR | Per Litre |
| LS | Lump Sum |
| LT | Per Long Ton |
| ME | Multiple Equipment |
| MI | Negative Charge |
| MM | Per Metric Ton (Tonne) |
| MN | Minimum |
| MX | Mixed Shipment Rule |
| PA | Per Container |
| PB | Per Barge |
| PC | Per Car |
| PD | Per Day |
| PE | Per 20 Foot Equivalent (TEU) |
| PF | Per Cubic Foot |
| PG | Per Gallon |
| PH | Per Hundred (of Basic Unit) |
| PK | Per Cord |
| PL | Per Load |
| PM | Per Mile |
| PP | Per Piece |
| PQ | Per Period |
| PR | Per Hour |
| PS | Per Shipment |
| PT | Per Net Ton |
| PU | Per Unit |
| PV | Per Vehicle |
| ST | Per Short Ton |
| SY | Square Yard |
| TB | Per 2 Trailers Same Day |
| TC | Per 3 Trailers Same Day |
| TD | Per 4 Trailers Same Day |
| TN | Per Train Rate |
| TR | Per Trailer (Per Train) |
| VM | Volume |
| VS | Various |