122 Rate/Value Qualifier
Code qualifying how to extend charges or interpret value.
- Type
- Identifier (ID)
- Length
- Min 2 / Max 2
- Codes
| Code | Description | 
|---|
 | AV | Ad Valorum (Per Cent of Value) |  | BF | Per 1,000 Board Feet |  | CF | Per 40 Cubic Feet (Measurement Ton) |  | CM | Per Cubic Meter |  | CT | Charge or Credit Based on Percentage of Total |  | EI | Ex Parte Increase |  | FR | Flat Rate |  | FV | Loaded to Full Visible Capacity |  | GT | Per Gross Ton |  | KL | Per Kilolitre |  | LB | Per Pound |  | LR | Per Litre |  | LS | Lump Sum |  | LT | Per Long Ton |  | ME | Multiple Equipment |  | MI | Negative Charge |  | MM | Per Metric Ton (Tonne) |  | MN | Minimum |  | MX | Mixed Shipment Rule |  | PA | Per Container |  | PB | Per Barge |  | PC | Per Car |  | PD | Per Day |  | PE | Per 20 Foot Equivalent (TEU) |  | PF | Per Cubic Foot |  | PG | Per Gallon |  | PH | Per Hundred (of Basic Unit) |  | PK | Per Cord |  | PL | Per Load |  | PM | Per Mile |  | PP | Per Piece |  | PQ | Per Period |  | PR | Per Hour |  | PS | Per Shipment |  | PT | Per Net Ton |  | PU | Per Unit |  | PV | Per Vehicle |  | ST | Per Short Ton |  | SY | Square Yard |  | TB | Per 2 Trailers Same Day |  | TC | Per 3 Trailers Same Day |  | TD | Per 4 Trailers Same Day |  | TN | Per Train Rate |  | TR | Per Trailer (Per Train) |  | VM | Volume |  | VS | Various |